Not a Bot brings joy to learning

Not a Bot is a game-based learning platform that makes engaging, STEM-focused games to help children learn in an interactive, hands-on way.

PLAY = LEARN = PLAY

Bring a Game Lab to your school

Game Lab is a learning space for students. Here they explore and further understand the concepts learnt in the classroom, practise the concepts in a hands-on way, engage with online and offline tools for learning, play with exhibits that nurture problem-solving and critical thinking skills, and learn in a joyful, self-driven way, building a healthier relation with the subjects and topics in their textbook. Research says concepts learnt this way are understood better and retained for longer. We believe in it.

16,000 students in our Game Lab schools, and 68,000 play sessions so far.

Why games

We are on a mission to bring joy to learning!
We want children to learn by discovery. So we make games!
Learning is best guided by educators. So we partner with them in making the games. Photos of teachers and children playing our games in class.
Moving the body prepares the mind for learning. So we use immersive technology to get kids moving.
Learning is a social sport between teachers & students, so our games enable inquiry, discussions, and collaboration. A cheering class with their teacher.
“Pedagogy must evolve to make education more experiential, holistic, integrated, inquiry-driven, discovery-oriented, learner-centered, discussion-based, flexible, and of course, enjoyable.” National Education Policy of India 2020

Our games

Game Lab is a learning space for students. Here they explore and further understand the concepts learnt in the classroom.
Face Quiz Answer questions about Maths, Patterns and Shapes by nodding your head, with Augmented Reality.
Time Teller Use your hands as the hour and minute hands of a clock to tell time!
Shapes Understand area, play with perimeter, visualise volume, to develop deep intuition for shapes.
Animals Speak to identify which animal’s head is mixed up with which animal’s body.
Little X Help introverted little X find peace in a world of noisy variables. Solve linear equations by isolating X.
Mirrors Using mirrors to redirect rays of light, learn about the angles of incidence and reflection.
Triangles Build triangles with a rope over pins and discover which side lengths and angles make a triangle possible.
Planet Factor Move your satellite around outer space while seeking only the planets that carry the multiples of a given number.
Tilt n Turn The player sets the road’s bank angle for a car at 30 m/s on a 90 m curve, and the car holds the turn.
Planet or Not The player reads a clue, picks Mars, and the probe flies there and sends back a postcard.
Expressions A fun online adventure game where your mission is to crack the algebraic equations using dots.
Fractional Baking Slice cakes to learn about fractions, and deliver them to the customers of your downtown bakery!
Codash Learn to code by moving your robot through a maze!

For teachers

Game Lab on three tablets: the teacher's tablet has opened Shapes, and two kids' tablets show Shapes with the class list, “Who's playing?”.
Open a game on your tablet and it opens on every tablet in the lab.
The Game Lab map: Grade 3, then Maths, then the topic Fractions, out of Measurement, Money, Number Concepts and more.
The Game Lab map lists the games for each grade, subject and topic.
The Game Lab dashboard for 1 A Maths, Shapes: “Students who should play more” cards with levels solved, average time and retries, and the Student Mastery Matrix of levels won out of attempted and average time per student.
The dashboard shows each child’s levels won and tried, retries and average time, game by game.
Class average progress chart: scores in Numbers, Shapes and Time rise across four sessions.
The chart shows the class average in each topic, session by session.
  • Orientation for your teachers
  • Train-the-trainer sessions
  • 6 weeks of facilitation support in class
  • Quarterly visits, and remote support
Teachers and children playing our games in class.
We set up the Game Lab and train your teachers to run it.
  • Managed tablets with a web filter
  • No ads
  • Only a child’s name, class and scores are kept
  • Your school stays in charge of its data (DPDP Act)
Read how we handle data.

Our team

We are IITians, NID graduates, Math professors, school educators, and long-time technologists working together to fulfill this mission by way of Not a Bot Game Lab. Photos of the team.

Impact made since 2022

  • 31,19,120 levels played
  • 67,040 Game Lab play sessions
  • 15,673 students
  • 20 schools and labs + 8 opening soon
    Game Lab Opening soon

    For schools

    We make STEM-focused games integrated with AR & AI for kids between 5 and 14 years of age, pre-school to 9th standard.

    Bring a Game Lab to your school

    For families

    Board and card games built by teachers for grades 1 to 8. Free delivery anywhere in India.

    Take a game box home